skip to main
|
skip to sidebar
Automatics Temperature Controlled Fan Speed Using Arduino
Social Icons
Popular Posts
Week 4 (26/8/2012 to 1/9/2012)
This week I also do a research for the project. I surf the internet to do the research, like always. I did a research on the wind chill fact...
Week 13 (28/10/2012 to 3/11/2012)
In this week, I tried to do the progress report for my proposal. This is how to do the progress report: - Introduction/Purpose Purpose of ...
Week 5 (2 to 8/9/2012)
Another week of research. This time I'm doing a research on types of fan control. Of all the types of fan control, 2 of them picked up m...
Week 8 (23 to 29/9/2012)
This week there was another briefing. The briefing was mostly about the proposal presentation. We were briefed about how to prepare before a...
Week 14 (4 to 10/11/2012)
I finally finished all the proposal and progress report of my project. I need a whole week to do it all since the progress report needs the ...
Week 11 (14 to 20/10/2012)
For this week, since I have done the proposal presentation, I was trying to finish up my proposal report. I still haven't finish the bud...
Week 10 (7 to 13/10/2012)
This is the week that I have to present my proposal to the assessor. I have to say I'm not that satisfied with my presentation. I felt t...
Week 3 (19 to 25/8/2012)
For this whole week I was doing research for my project. I was looking for other similar temperature controlled cooling systems so I can dif...
Week 1 (5 to 11/8/2012)
Today is the first week for the semester S2 2012. All students who are taking Final Year Project 1 must choose a supervisor for their final ...
Week 6 (9 to 15/9/2012)
For this week, all the students were briefed on the details that must be made in the report and the marks given for each item. FYP calendar ...
Sample Text
Followers
Powered by
Blogger
.
About Me
naim
Blog of Final Year Project: Automatics Temperature Controlled Fan Speed Using Arduino
View my complete profile
Sample Text
Music
Sunday, 7 October 2012
Week 9 (30/9/2012 to 6/10/2012)
This week I was preparing for the power point slides that I will use to present my project proposal to the assessor. This is how some of my slides look like:
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Blog Archive
►
2013
(15)
►
April
(4)
►
March
(5)
►
February
(4)
►
January
(2)
▼
2012
(14)
►
November
(2)
▼
October
(4)
Week 12 (21 to 27/10/2012)
Week 11 (14 to 20/10/2012)
Week 10 (7 to 13/10/2012)
Week 9 (30/9/2012 to 6/10/2012)
►
September
(5)
►
August
(3)
No comments:
Post a Comment