Week 4 (26/8/2012 to 1/9/2012)
This week I also do a research for the project. I surf the internet to do the research, like always. I did a research on the wind chill fact...
Week 13 (28/10/2012 to 3/11/2012)
In this week, I tried to do the progress report for my proposal. This is how to do the progress report: - Introduction/Purpose Purpose of ...
Week 5 (2 to 8/9/2012)
Another week of research. This time I'm doing a research on types of fan control. Of all the types of fan control, 2 of them picked up m...
Week 8 (23 to 29/9/2012)
This week there was another briefing. The briefing was mostly about the proposal presentation. We were briefed about how to prepare before a...
Week 10 (7 to 13/10/2012)
This is the week that I have to present my proposal to the assessor. I have to say I'm not that satisfied with my presentation. I felt t...
Week 3 (19 to 25/8/2012)
For this whole week I was doing research for my project. I was looking for other similar temperature controlled cooling systems so I can dif...
Week 1 (5 to 11/8/2012)
Today is the first week for the semester S2 2012. All students who are taking Final Year Project 1 must choose a supervisor for their final ...
Week 14 (4 to 10/11/2012)
I finally finished all the proposal and progress report of my project. I need a whole week to do it all since the progress report needs the ...
Week 11 (14 to 20/10/2012)
For this week, since I have done the proposal presentation, I was trying to finish up my proposal report. I still haven't finish the bud...
Week 12 (21 to 27/10/2012)
This week I finally figured out the budget for my project. The costing of my project is just a draft but I try to save as much money as poss...
Sample Text
Followers
Powered by
Blogger
.
About Me
naim
Blog of Final Year Project: Automatics Temperature Controlled Fan Speed Using Arduino
View my complete profile
Sample Text
Music
Sunday, 7 October 2012
Week 9 (30/9/2012 to 6/10/2012)
This week I was preparing for the power point slides that I will use to present my project proposal to the assessor. This is how some of my slides look like:
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
Blog Archive
►
2013
(15)
►
April
(4)
►
March
(5)
►
February
(4)
►
January
(2)
▼
2012
(14)
►
November
(2)
▼
October
(4)
Week 12 (21 to 27/10/2012)
Week 11 (14 to 20/10/2012)
Week 10 (7 to 13/10/2012)
Week 9 (30/9/2012 to 6/10/2012)
►
September
(5)
►
August
(3)
No comments:
Post a Comment